top of page
Lateral 86.4 Construction Photos & Videos
Photos and videos of Lateral 86.4 are provided thanks to OGWRP project partners, landowners, and supporters.
Ribbon Cutting for EL 86.4 Irrigation System
A gathering was held on Monday, May 5, 2025, to celebrate the launch of the EL 86.4 irrigation system. This is the second OGWRP system to come into production and replaced groundwater with surface water for 5500 acres.
Video courtesy of the East Columbia Basin Irrigation District.
Lateral 86.4 Photos
bottom of page